Friday, January 11, 2013

January 11th

January 2nd.

E-mail Dr. Lusina with the finalized group:

Aramazd Gharapetian (Group Manager)
Jobin Ansari-Gilani 
Navin Abeysundara 
Albert Chong 
Wajih Al-Qutub 
Aaron Wu (to join the group later on)

January 8th.

Begin dividing the tasks among the members:


Chassis/ball retrieval system - Wajih Al-Qutub
Wireless communications – Navin Abeysundara
Path finding algorithm – Jobin Ansari / Wajih Al-Qutub
Drivetrain/power system – Aramazd Gharapetian / Albert Chong
Sensor systems/beacons - Navin Abeysundara / Aramazd Gharapetian


January 11th.

Begin shopping for the parts:

Location: Lee's electronics and ...


Bought:
1) two motors
2) a low range infrared transmitter/receiver
3) a medium range infrared transmitter/receiver
4) three photoelectric sensors
5) two wheels
6) a battery dock
7) two XBee series 2




No comments:

Post a Comment