January 8th
-Met with group and discussed design options and tasks to be assigned to each member according to preference.
January 10th -11th
-Went with Aramazd and Jobin to Lee's Electronics and purchased all primary components.
- 2 Motors @100 rpm
- 1 low range infrared transmitter/receiver
- 1medium range infrared transmitter/receiver
- 3 photoelectric sensors
- 2 wheels
- 1 battery socket
- 2 XBee series 2 modules
January 14th
-Met with group members and discussed the progress of our project.
January 18th
-Scheduled a one-on-one tool training with Mr. Mark Finniss for January 21st
January 20th
-Assisted Aramazd in designing and building the chassis (basic model).
January 21st
-One-on-one tool training with Mr. Mark Finniss (completed Bending, Shearing, Drill Press, Bandsaw, and Spot Welder tools)
-Met with group members and planned the proposal report.
-Completed the project risks and mitigation strategies.
-Completed personal gantt chart.
-Prepared for the Presentation.
January 22nd
-Planning proposal presentation
January 24th
-Went with Navin and Aramazd to Lee's Electronics and purchased Components
January 25th
-Familiarized myself with AutoCAD and started sketching our robot.
January 29th
-Familiarized myself with Solidworks using online tutorials. (switched from AutoCad to Solidworks for convenience).
February 2nd
-Measurements of our robot was noted and started designing/modelling it on solid works.
February 4th - 7th
-Helped Aramazd build the beacon, and partially completed solidworks for the ball retrieval system.
February 15th- 16th
February 25th- 28th
-Designed and built the ball retrieval system using solidworks (ordered the parts)
March 6th - 12th
- Received the parts, painted the parts and assembled the robot with the new chassis.
- Worked with Navin on the grid sensor construction and installation onto the sensor level of the chassis.
- Went to lee's with Aramazd to pickup limit switches for ball catch detection.
March 13th - 28th
- Integration demonstration review and improvements
- Helped the group during the Testing and Integration phase
- Completed IPeer Evaluation and Survey
-Exit Demonstration and Presentation
April 7th
- Completed Tutorial Video
- Integration demonstration review and improvements
- Helped the group during the Testing and Integration phase
- Completed IPeer Evaluation and Survey
-Exit Demonstration and Presentation
April 7th
- Completed Tutorial Video